Home Solar EPC
Solar Solutions for Your Home
Generate clean electricity from your own roof, reduce TNEB bi-monthly bills to near zero, and get up to Rs. 78,000 direct bank subsidy from the central government.
Save Wisely
Benefits of Home Solar
Installing solar panels transforms your unutilized terrace into a clean green power source that generates savings for 25+ years.
Up to 90% Bill Savings
Offsets high-cost slab rates. In Tamil Nadu, residential consumption above 500 units incurs high tariffs. Solar eliminates these high-cost units.
Central Govt Subsidy
Receive up to Rs. 78,000 directly in your Aadhaar-linked bank account within 30 days under the PM Surya Ghar Yojana central scheme.
TNEB Net Metering
Export surplus daylight power to the grid. Exported units subtract directly from your imported nighttime units, cutting bills to zero.
25-Year Warranty
We install Vikram Solar panels featuring a 25-year performance warranty and robust Growatt smart inverters with 5-10 year support.
Environmental Impact
A standard 3 kW residential plant prevents approximately 3.6 metric tons of CO2 emissions annually, equivalent to planting 160 trees.
Property Value Boost
Homes equipped with operational, TNEB-approved solar plants enjoy higher market value and clear energy self-sufficiency appeal.
Tamil Nadu Context
Designed for Tamil Nadu's Slabs
TANGEDCO billing is bi-monthly for homes. If consumption exceeds 500 units, the tariff rises steeply. Installing a rooftop system prevents your consumption from entering these high-tariff slabs.
Shasha Solar represents local expertise. We handle all liaison work with TNEB local offices in Coimbatore, Tiruppur, Erode, Salem, and other Tamil Nadu regions.
TANGEDCO Slab Savings Example
For a bi-monthly consumption of 800 units, the bill is approximately Rs. 5,500.
With a 3 kW solar plant generating 720 units bi-monthly, net units billed drop to 80 units.
Your new bill is reduced to the basic charge: ~Rs. 350. You save ~Rs. 5,100 every two months!
National Scheme Info
PM Surya Ghar Subsidy & ROI Structure
The subsidy is capped at 3 kW. You can install higher capacities (e.g., 5 kW or 10 kW) to meet high load demands, but the subsidy amount is capped at Rs. 78,000.
| System Capacity | Monthly Generation | Avg. Setup Cost | MNRE Subsidy | Net Outlay | Avg. Annual Savings | Payback Period |
|---|---|---|---|---|---|---|
| 1 kW System | ~120 Units | Rs. 60,000 | Rs. 30,000 | Rs. 30,000 | Rs. 8,600 | ~3.4 Years |
| 2 kW System | ~240 Units | Rs. 1,20,000 | Rs. 60,000 | Rs. 60,000 | Rs. 17,200 | ~3.4 Years |
| 3 kW System | ~360 Units | Rs. 1,80,000 | Rs. 78,000 | Rs. 1,02,000 | Rs. 25,900 | ~3.9 Years |
| 5 kW System | ~600 Units | Rs. 2,75,000 | Rs. 78,000 | Rs. 1,97,000 | Rs. 43,200 | ~4.5 Years |
| 10 kW System | ~1200 Units | Rs. 5,30,000 | Rs. 78,000 | Rs. 4,52,000 | Rs. 86,400 | ~5.2 Years |
Roof Layout Requirements
- ⚡Space Needed: ~100 sq. ft. of clean shadow-free terrace area is required for every 1 kW capacity.
- ⚡Direction: South-facing orientation is ideal to capture maximum sunlight throughout the year.
- ⚡Structure Type: Standard flat concrete roofs use anchor fast-pinned galvanized structures. High-raised custom frames are optional if you wish to use the terrace underneath.
Sizing Guide
Home Solar Capacity Guide
For individual homes, systems usually range between 1 kW and 10 kW. For most independent houses, a 3 kW system represents the ideal balance of investment, maximum PM Surya Ghar subsidy, and bill offset capability.
Gated communities, housing societies, or large residential apartments can install larger systems for shared loads (elevators, common lighting, water pumps).
How We Execute
Your Solar Journey
Shasha Solar provides complete turnkey support. Here are the six steps from initial consultation to receiving your subsidy.
1. Enquiry & EB Bill Study
Contact us with your bill. We calculate recommended capacity and check local feeder availability.
2. Free Roof Survey
Our engineers visit your site to test structural strength, shadow elements, and layout angles.
3. TNEB Portal Apply
We register your project on the National Rooftop Portal and secure TNEB technical feasibility approval.
4. Quality Installation
Our technicians install the panels and inverter with structured cable wiring within 3 to 5 days.
5. Meter & Grid Connect
TNEB replaces your meter with a bi-directional net meter. The system goes live immediately.
6. Subsidy Credit
We upload the commissioning report. The central subsidy is credited directly to your bank account within 30 days.
Required Files
Documents Needed for TNEB Approval
To ensure quick, hassle-free processing on the national portal, keep these files ready. Our documentation team handles all filing work:
- ✓ Aadhaar Card (matching the name on the electricity bill)
- ✓ Latest TNEB Electricity Bill Receipt
- ✓ Property Tax Receipt or Sale Deed copy (address verification)
- ✓ Passport size photograph of connection holder
- ✓ Aadhaar-linked Bank account details (for subsidy credit)
Get a Customized Estimate
Provide details below to book a free site survey and get a detailed proposal.
